Get rid of the setting up’s trim and siding until eventually it’s one foot above the top of in which the ledger will sit. Cover the exposed sheathing with self-adhering water-resistant membrane.Disclaimer: This pictorial is for informational reasons only and is offered to provide you with an thought as to what is involved withSpot a connect wit